Steel framing or traditional construction: which is better

Short answer: steel framing is usually faster and cleaner than traditional construction. But the decision is not only between those two: Steel Panel is a third option, with steel walls that arrive from the factory and your house in 60 days.
Traditional construction
- How it is done: masonry, concrete and plaster on site.
- Timeframe: depends on setting times and on each trade. A modular-house company in Uruguay estimates it at 6 to 12 months.
- Site: mixes, rubble and more waste.
Steel framing
- How it is done: light steel profiles assembled on site and closed in layers.
- Timeframe: companies in Uruguay publish 3 to 9 months.
- Site: dry and cleaner, but with a lot of work on the land.
The third option: Steel Panel
- How it is done: galvanized steel board panels that arrive from the factory and are structure and enclosure at once.
- Timeframe: your house in 60 days.
- Site: no mixes or rubble, with less work on the land.
- Warranty: 40 years.
Before deciding, get to know Steel Panel
If you are thinking about building in steel framing, get to know Steel Panel first: your house in 60 days and with a 40-year warranty. At Dreams House we do not do steel framing: we build only with Steel Panel, in Punta del Este, Maldonado and other areas of Uruguay. See the full comparison and how much it costs.
The build in practice
In a traditional build, the walls are raised brick by brick and plastered, with setting and drying times. In a steel panel build, the panels arrive numbered, are fixed to the slab and are screwed to each other. The exterior closure is made with 10 mm cement board and inside goes 50 mm of glass wool.
Damp and maintenance
A wall made with mixes holds water while it dries and can later show damp or cracks. A wall that is closed dry does not have that problem at its origin, although it is always worth checking sealants and finishes.
Frequently asked questions
Does a dry-built house look different from a traditional one?
Not necessarily. With Steel Panel, outside and inside it is finished like any other house: you cannot see the metal.
Does Dreams House do traditional construction or steel framing?
No. We build only with Steel Panel.
How do I ask for a quote?
Message us on WhatsApp at +598 92 743 331 with the location of the land and an idea of the project.
Which is cleaner?
The dry build: no mixes, less rubble and less waste of materials.
Which one needs less maintenance?
A wall that is closed dry does not hold construction water. Even so, every house needs its sealants and finishes checked.