Dry construction in Maldonado and Punta del Este

We build houses and commercial units of up to two floors in dry construction, with galvanized steel panels manufactured at the plant: your house in 60 days and with a 40-year warranty. We work in Punta del Este, throughout the department of Maldonado and in other areas of Uruguay, from the project to handover.
What we do
- Custom houses: personalized homes of one or two floors.
- Commercial works: commercial units and buildings of up to two floors.
- Project, manufacturing and assembly: from the design to the final assembly on your land.
How we work
- Project: we design the house with you and define each panel.
- Foundation: we prepare the concrete slab on the land.
- Manufacturing: the panels are manufactured at the plant, identified for each wall.
- Assembly: they are fixed to the slab and screwed to each other.
- Enclosures and finishes: insulation, boards inside and outside, openings and finishes.
Why build dry with SteelPanel
- A faster build: your house in 60 days, with no setting times.
- 40-year warranty: to build with peace of mind.
- A clean, tidy site: no mixes or rubble, with less waste.
- Precision: industrialized pieces with controlled measurements.
- Designed for the coast: galvanized steel, with reinforced protection intended for marine environments.
Building dry or in steel framing
If you are comparing systems, you will also find steel framing, which assembles the structure on site profile by profile. At Dreams House we build with Steel Panel: the steel walls arrive from the factory, ready to assemble. That is why the build is faster and cleaner, and requires less work on the land.
Areas where we work
Punta del Este, Maldonado, La Barra, Manantiales, José Ignacio, Piriápolis, San Carlos and other areas of Uruguay.
Learn more in our guide to dry construction in Uruguay and in why, if you are thinking about steel framing, you should get to know Steel Panel first.
How much does it cost? Your turnkey house from US$1,499 per m².
What a dry wall is like
From outside to inside: 10 mm cement board, zinc-coated steel panel of at least 0.8 mm, 50 mm glass wool and gypsum board. For the coast of Maldonado, zinc class Z350, the marine-environment class, is provided. Water pipes and electrical conduits run inside the panels.
Frequently asked questions
What is dry construction?
It is a way of building that does not depend on concrete and mortar that have to set: the pieces arrive manufactured and are assembled with fixings. SteelPanel is a dry construction system with galvanized steel panels.
How many floors can be built with SteelPanel?
SteelPanel is designed for houses and commercial units of up to two floors.
Do you work outside Punta del Este?
Yes. We work throughout the department of Maldonado and in other areas of Uruguay.
How long does a dry house with Dreams House take and what warranty does it have?
Your house is ready in 60 days and has a 40-year warranty.
How do I ask for a quote?
Message us on WhatsApp at +598 92 743 331 or at contacto@dreamshouse33.com with the location of the land and an idea of the project.
What is a dry build?
It means building without mixes that have to set: the pieces arrive manufactured and are assembled with fixings.
How thick is the wall?
125.5 mm of total thickness on one floor and 138 mm on two floors.
What technical backing does it have?
A technical assessment of the system, carried out in Brazil by a public research institute, for houses of up to two floors.