Short answer: if you are thinking about building in steel framing, get to know Steel Panel first. Steel framing builds the structure with light steel profiles, spaced apart, that are then closed with boards and insulation in layers. SteelPanel builds with galvanized steel plates: self-supporting panels that arrive from the factory and are structure and enclosure at once. In addition, your house is ready in 60 days and has a 40-year warranty.

If you are looking for a steel framing house in Punta del Este or Maldonado, it is worth getting to know SteelPanel before deciding. They seem like similar systems because both use steel and are dry construction, but they are completely different.

What steel framing is

Steel framing (or steel frame) is a system in which the structure is formed with light galvanized steel profiles, spaced apart, that work as a skeleton. On that skeleton, exterior boards, water and wind barriers, thermal and acoustic insulation and interior boards are placed in layers.

  • Structure: light galvanized steel profiles.
  • Enclosure: layers of boards and insulation added over the structure.
  • On site: the skeleton is assembled and then each layer is completed.

What SteelPanel is

SteelPanel is the exclusive building system of Dreams House. It is made up of self-supporting metal panels built with galvanized steel plates, which fulfil structural and dividing functions at the same time. Since they are prefabricated, they arrive ready to assemble.

  • Structure and enclosure: the same panel does both functions.
  • Manufacturing: industrialized, at the factory, with precise measurements.
  • Timeframe: your house in 60 days.
  • Warranty: 40 years.
  • Scope: buildings of up to two floors, residential or commercial.
  • No cement or mortar in the composition of the system.

Why SteelPanel is much better than steel framing

Steel plates instead of light profiles

This is the fundamental difference. In steel framing, what holds the house up is a skeleton of light profiles, and the boards only close it. In SteelPanel, the wall itself is steel: the self-supporting panel holds and divides. That is why it is much stronger.

Your house in 60 days

In steel framing the work on the land is greater: the structure is assembled profile by profile and then the layers are closed. With SteelPanel a good part of the work already comes done from the factory and the assembly is direct: in our comparison, the structure goes up in 3 days against 30 for steel frame. That is what allows us to promise your house in 60 days.

  • Steel framing: structure and layers are completed on site.
  • SteelPanel: prefabricated panels installed as a unit.
  • Result: a faster, cleaner build with less wasted material.

40-year warranty

SteelPanel houses come with a 40-year warranty. Ask us about the conditions for your project.

Tested against category 5 hurricanes

The panels were approved by Miami-Dade County, in the United States, for high-velocity hurricane zones, category 5. They are interlocking, screwed modules that every 610 mm form double-sheet pillars with compressive strength. The result is lightweight buildings as strong as concrete ones. In addition, galvanized steel is not affected by termites or mould.

A patented and assessed system

  • Patent: the panel is patented in the United States (US 11,208,807).
  • Technical assessment: DATec in Brazil, for houses of up to two floors.
  • Quality: ISO 9001:2015 certification.

More than 1,000,000 m² built

This system has already been used in more than 1,000,000 m² of works in Brazil. With Steel Panel, a 3,000 m² school was built in 42 days, a 12,800 m² hospital in 60 days and a 1,000 m² house in 60 days, plus more than 20 McDonald's restaurants.

Fewer pieces to coordinate

In steel framing the profile holds and the boards close, and each layer is a separate job. In SteelPanel a single panel fulfils both functions, which simplifies the number of pieces that have to be coordinated on site.

What they have in common

  • They are dry construction: they do not depend on the mixing and setting of traditional building.
  • They use galvanized steel, a material protected against corrosion.
  • They allow custom designs and different interior and exterior finishes.

Which one to choose

If you are going to build a house or commercial unit of up to two floors, choose SteelPanel: steel plates, 60 days and a 40-year warranty. At Dreams House we work only with this system, in Punta del Este, Maldonado and other areas of Uruguay. If you want to see all the systems, read our guide to dry construction in Uruguay.

Frequently asked questions

Is SteelPanel the same as steel frame?

No, they are completely different. Steel frame uses light profiles that are closed with boards in layers. SteelPanel uses prefabricated self-supporting panels of galvanized steel plates, which are structure and enclosure at once.

Is SteelPanel stronger than steel frame?

Yes, much more: the wall is made of steel plates that hold and close at once, instead of a skeleton of light profiles. It is also approved in Miami-Dade for category 5 hurricanes.

How long does it take for a SteelPanel house to be ready?

60 days.

What warranty does a SteelPanel house have?

SteelPanel houses come with a 40-year warranty. Ask us about the conditions for your project.

Does Dreams House build in steel frame?

No. Dreams House builds only with the SteelPanel system, from the project and the manufacturing of the panels to the final assembly on the land. We do not do steel frame or traditional construction.

How many floors can be built with SteelPanel?

SteelPanel is a solution for buildings of up to two floors, residential or commercial.

Where does Dreams House build?

In Punta del Este, throughout the department of Maldonado and in other areas of Uruguay.