Steel framing in Uruguay: what to know before building

· Dreams House

Steel framing in Uruguay: what to know before building

Short answer: steel framing is a dry construction system with light galvanized steel profiles, assembled on site and closed with boards and insulation in layers. Before deciding, compare the timeframe, the warranty and what the price includes. And if you are thinking about steel framing, get to know Steel Panel first.

What steel framing is

The structure is formed by light galvanized steel profiles, spaced apart, that work as a skeleton. On that skeleton, layers are fitted: exterior boards, water and wind barriers, thermal and acoustic insulation, and interior boards.

What the build looks like

  • Foundation: the base is prepared on the land.
  • Structure: the skeleton of profiles is assembled.
  • Enclosure: the layers of boards and insulation are completed.
  • Installations and finishes: the house is finished.

What to ask before hiring

  • What is the delivery timeframe and from what moment is it counted?
  • What warranty does the house have and what does it cover?
  • What does the price per m² include: slab, permits, taxes and finishes?
  • Is it turnkey, or are there parts I hire separately?
  • Can I see finished houses?
  • What protection does the steel have if I build near the sea?

How long it takes and how much it costs

In Uruguay, steel framing companies publish timeframes of 3 to 9 months, depending on the project. On price, the important thing is to compare what each price per m² includes. We explain it in how much it costs to build in steel framing in Uruguay. You can also read its pros and cons.

Before deciding, get to know Steel Panel

If you are thinking about building in steel framing, get to know Steel Panel first: your house in 60 days and with a 40-year warranty. At Dreams House we do not do steel framing: we build only with Steel Panel, in Punta del Este, Maldonado and other areas of Uruguay. See the full comparison and how much it costs.

A question almost nobody asks: the technical assessment

Before hiring, ask whether the system you are offered has a technical assessment carried out by an independent body, what it covers and until when it is valid. In the case of Steel Panel, the technical assessment of the system was carried out in Brazil by a public research institute and covers the structural walls and the intermediate floor of houses of up to two floors.

What arrives assembled and what does not

In a light-profile system, a good part of the structure is assembled on the land. With Steel Panel the panels arrive assembled from the factory, numbered for each wall, and on site they are fixed and screwed together. That is why less is done on the land.

Frequently asked questions

Is steel framing dry construction?

Yes. It does not depend on the mixing and setting of traditional construction.

Does Dreams House do steel framing?

No. We build only with Steel Panel.

How do I ask for a quote?

Message us on WhatsApp at +598 92 743 331 with the location of the land and an idea of the project.