Turnkey house: how to compare quotes

· Dreams House

Turnkey house: how to compare quotes

Short answer: turnkey means one company takes charge of the whole build and you receive the finished house. To compare quotes, the price per m² is not enough: you have to compare what each one includes.

What a turnkey build is

In an ordinary build, each trade is hired separately and someone has to coordinate them. In a turnkey build there is a single party responsible from start to finish. If something is delayed, you do not have to chase down whom to hold accountable.

What it should include

At Dreams House, turnkey means the complete house:

  • Preliminary design and project.
  • Structure.
  • Plumbing installation.
  • Electrical installation.
  • The finished house, from start to finish.

How to compare two quotes

  • Ask for the detail in writing. Two equal prices per m² can include very different things.
  • Ask what is left out. If something is hired separately, it is one more cost.
  • Check the timeframe and when it starts counting. At Dreams House it is 60 days from the first day of construction.
  • Check the warranty. How many years, what it covers and whether it is in writing. Ours is 40 years.
  • Ask about finished houses. Seeing a house that has been built says more than any brochure.

How much it costs

A Dreams House turnkey house starts at US$1,499 per m². It varies with size, design, finishes and location. More detail in turnkey houses and in price per m² and timeframes.

What each stage of a turnkey build includes

  • Preliminary design and project: the floor plan, the facades and the structural project. Each house has its own.
  • Slab: the concrete base on which the panels are fixed.
  • Structure and enclosure: the steel panels made in the factory, the exterior cladding with cement board, the glass wool and the interior boards.
  • Installations: water pipes and electrical conduits run inside the panels, so walls do not have to be broken open afterwards.
  • Finishes and handover: the house ready to live in.

A warning sign

If a turnkey quote does not tell you what each stage includes, or leaves the slab and the installations "for later", it is not turnkey. Always ask for the list in writing and compare stage by stage.

Frequently asked questions

Does turnkey include the project?

Yes. It includes the preliminary design and the project.

Can I choose the design?

Yes. We build to measure, in one or two floors.

How do I ask for a quote?

Message us on WhatsApp at +598 92 743 331 with the location of the land and an idea of the project.

How do I know whether a quote includes everything?

Ask for the detail in writing and compare stage by stage: project, slab, structure, installations and finishes.

What warranty does the house have?

A 40-year warranty. Always ask for it in writing.