Fast-build houses: your house in 60 days

A build is fast when less is done on the land. With Steel Panel the steel walls arrive from the factory and are assembled: your house is ready in 60 days and has a 40-year warranty. We build in Punta del Este, Maldonado and other areas of Uruguay.
Why a Steel Panel build is faster
- There is no setting: it is dry construction, with no concrete or mortar in the walls to wait for.
- The walls arrive ready: each panel is manufactured at the plant, identified for its place.
- The panel holds and closes: a single piece acts as structure and enclosure.
- The installations go inside the panel: there is no need to break into the work to run them.
- Fewer trades at once: fewer things to coordinate and fewer waits.
What timeframes other systems have
- Traditional construction: a modular-house company in Uruguay estimates it at 6 to 12 months.
- Steel framing: companies in Uruguay publish 3 to 9 months.
- Steel Panel with Dreams House: 60 days.
Works done with this system
These works were done in Brazil with the same system:
- House in Xangri-lá: 450 m² in 60 days.
- House in Porto Feliz: 1,000 m² in 60 days.
- Darcy Ribeiro School, Florianópolis: 3,000 m² in 42 days.
- Hospital in Nova Iguaçu: 12,800 m² in 60 days.
Fast does not mean temporary
A house can be built fast because it is small and simple, or because the work was done beforehand, at the factory. Ours is the second kind: it rests on a concrete slab, is finished like any house and has a 40-year warranty.
What changes most when the build is short
- Less rent while you wait for your house.
- Sooner in your home or your business: if it is a commercial unit, you open sooner.
- Less noise and less rubble on your land and for your neighbours.
Why the build is short, in detail
- The panels are manufactured at the plant in parallel with the slab, not one after the other.
- The walls arrive numbered for each place in the project.
- The water and electrical installations go inside the panels.
- There are no mixes that have to set or dry.
What takes time and what does not
Manufacturing and the slab are done in parallel, the assembly of the panels is quick and the enclosures and finishes are what take the most time. The 60-day timeframe is counted from the first day of construction.
Frequently asked questions
How long does it take to build a house with Steel Panel?
Your house is ready in 60 days, counted from the first day of construction.
Is such a fast build of lower quality?
No: what is shortened is the work on the land. The panels are made at the plant, with controlled measurements, and the house has a 40-year warranty.
How much does it cost?
From US$1,499 per m², turnkey. See price per m² and timeframes.
Do you build commercial units?
Yes, commercial units and buildings of up to two floors.
How do I ask for a quote?
Message us on WhatsApp at +598 92 743 331 with the location of the land and an idea of the project.
Why can the build be so short?
Because the panels are manufactured at the plant while the slab is prepared on the land, and because on site there are no mixes that have to set or dry.
What happens with the installations?
Water pipes and electrical conduits run inside the panels, so walls do not have to be broken open afterwards.
What is done first on site?
The walls are marked out on the slab, levels are checked, the asphalt membrane is placed and the panels are fixed with stainless steel anchor screws.