Steel framing in Punta del Este: get to know what comes next

If you are thinking about building in steel framing, get to know Steel Panel first. It is the new way of building dry: steel walls that arrive from the factory. Your house in 60 days and with a 40-year warranty, in Punta del Este, Maldonado and other areas of Uruguay.
What comes after steel framing
Steel framing assembles the structure on site, profile by profile, and then closes each layer. Steel Panel changed that way of building: the walls are self-supporting panels of galvanized steel plates, manufactured at the plant, that hold and close at once. At Dreams House we build only with this system.
Why choose Steel Panel
- Speed: your house in 60 days. The structure goes up in 3 days, against 30 for steel framing.
- Strength: steel walls, with double-sheet pillars every 610 mm.
- Damp, cold and heat: a closed and insulated wall, with a water and wind barrier, and reinforced protection intended for the coast.
- Warranty: 40 years.
- A clean site: no mixes or rubble, with less waste and less work on the land.
- Precision: straight walls and openings that fit, with measurements controlled at the factory.
- Custom design: houses of one or two floors, with four panel types and finishes of your choice.
To see the full comparison, read SteelPanel vs steel framing: why SteelPanel is better. And if you want to see how we work in the area, look at dry construction in Maldonado and Punta del Este.
How much does it cost? Your turnkey house from US$1,499 per m².
The steel wall, in numbers
The modules are cold-formed zinc-coated steel, at least 0.8 mm. The exterior wall measures 125.5 mm in total thickness on one floor and 138 mm on two floors, with 50 mm of glass wool. For marine environments, such as Punta del Este, zinc class Z350 is provided.
Frequently asked questions
Is Steel Panel steel framing?
No. Both are dry construction with galvanized steel, but they are different systems. Steel framing uses light profiles that are closed with boards in layers. Steel Panel uses panels of steel plates, manufactured at the plant, that are structure and enclosure at once.
Does Dreams House do steel framing?
No. We build only with Steel Panel.
How long until the house is ready?
60 days.
What warranty does it have?
40 years.
Does the house look different?
No. Outside and inside it is finished like any house: the metal is not visible.
How do I ask for a quote?
Message us on WhatsApp at +598 92 743 331 with the location of the land and an idea of the project.
Does it work near the sea?
The system provides zinc class Z350 for marine environments, and the steel stays closed inside the wall. It is not for highly aggressive environments, such as industrial atmospheres.
How many floors?
Up to two floors.
How do the panels arrive on site?
Manufactured at the plant, numbered for each wall and ready to be fixed to the slab.